DETAILS OF WORK

Sea-fastening for MEG chemical tanks, transfer pumps, hose Neels, Test Carbine, generator onsets etc.

DESIGN WORKS  – Analysis of the ship structure -Impact of all the top weight on stability of the vessel -Weight effect calculation on the vessel_ structure -Load calculation on the deck. -Stability analysis and calculation of the Vessel with the cargo. -Detailed calculations and drawings for installation and servicing cargo

INSTALLATION WORKS  -Steel material identification and procurement. -Prefabrication works. -Installations and welding -DNV Certification

REMOVAL WORKS( SEA-FASTENING )  -Removal of all strapping brackets, lockers, stoppers, beams etc. by Gauging, Plasma Cutting and Metal disc cutting processes. -Repair of ships deck (Welding/filling, grinding and polishing works).